|
The bodies of the entire 12 m length of the truck are manufactured in GRP. This partnership with the constructor has today driven to the project “team cabin”. The key of its success is the sandwich structure which helped develop bigger cabins for drivers, water tank, and combined accessories.
|
|
The entire 12 m length of the truck is manufactured in GRP. This partnership with the constructor has today driven to the project “team cabin”. The key of its success is the sandwich structure which helped develop bigger cabins for drivers, water tank, and combined accessories. Keen for improvements, Steiner and SAERTEX used SAERfoam® glass reinforced core to achieve better temperature resistance and increase efficiency together with cost saving
|
|
Die Aufbauten des zwölf Meter langen LKW wurden aus glasfaserverstärktem Kunststoff hergestellt. Die Partnerschaft mit dem Hersteller hat nun das Projekt „team cabin“ vorangetrieben. Ein wichtiger Erfolgsfaktor ist die Sandwichkonstruktion, wodurch größere Fahrerkabinen, Wassertanks und kombiniertes Zubehör hergestellt werden können. Aufgrund ihres großen Interesses an Verbesserungen haben sich Steiner und SAERTEX für die Verwendung des glasfaserverstärkten SAERfoam®-Kernmaterials entschieden, um eine bessere Temperaturbeständigkeit, eine höhere Effizienz und Kosteneinsparungen zu erzielen.
|