ioc – Traduction – Dictionnaire Keybot

Spacer TTN Translation Network TTN TTN Login Deutsch English Spacer Help
Langues sources Langues cibles
Keybot      4'030 Résultats   546 Domaines   Page 5
  assemblysys.com  
Since 2010 she is an Associate Professor at the School of Industrial Engineering of Barcelona (Department of Management, UPC), in the field of entrepreneurship and quantitative methods. She is a researcher at the Institute of Industrial and Control Engineering (IOC) in the area of productive operations, specifically in scheduling and line balancing.
Gema Calleja es Profesora a tiempo completo en el Departamento Académico de EAE Business School, Doctora en Administración y Dirección de Empresas e Ingeniera de Organización Industrial por la Universitat Politècnica de Catalunya (UPC). Desde 2010 es Profesora Asociada del Departamento de Organización de Empresas de la UPC, donde imparte asignaturas en la Escuela Técnica Superior de Ingeniería Industrial de Barcelona (ETSEIB), en las disciplinas de emprendimiento y métodos cuantitativos. En el Instituto de Organización y Control de Sistemas Industriales (IOC) realiza su actividad investigadora en el área de operaciones productivas, más concretamente, en la secuenciación y equilibrado de líneas de montaje. En el sector privado cuenta con más de 7 años de experiencia como Ingeniera de Organización Industrial en empresas de los sectores construcción y automoción. GCS
Gema Calleja és Professora a temps complet en el Departament Acadèmic d’EAE Business School, Doctora en Administració i Direcció d’Empreses i Enginyera d’Organització Industrial per la Universitat Politècnica de Catalunya (UPC). Desde 2010 és Professora Associada del Departament d’ Organización d’Empreses de la UPC, on imparteix assignatures a l’Escola Tècnica Superior d’Enginyeria Industrial de Barcelona (ETSEIB), en les disciplines d’emprenedoria i mètodes quantitatius. A l’Institut d’Organització i Control de Sistemes Industrials (IOC) realitza la seva activitat de recerca en el camp de les operacions productives, més concretament, en la sequenciació i balanceig de línees de muntatge. En el sector privat compta amb més de 7 anys d’experiència com a Enginyera d’Organització Industrial en empreses dels sectors construcció i automoció. GCS
  www.ohtb.gov.on.ca  
For the past two years, Oiltanking has been working with the Indian state-owned companies IOC and IBP to further tank terminal projects in India. To this end, the joint venture enterprise Indian Oiltanking Ltd was founded in autumn 1996, with Oiltanking GmbH and its Indian partners owning 50% and 25% stakes respectively.
Bereits seit zwei Jahren arbeitet Oiltanking mit den indischen Staatsgesellschaften IOC und IBP an der Realisierung von Tanklagerprojekten in Indien. Dazu wurde im Herbst 1996 die Joint-Venture-Gesellschaft Indian Oiltanking Ltd. gegründet, an der die Oiltanking GmbH mit 50% und die beiden indischen Partner mit jeweils 25% beteiligt waren.
  www.e3dc.com  
The Greater Geneva Bern area is home to more international sports federations and institutions than any other region in the world. Organizations such as the International Olympic Committee (IOC), the Union of European Football Associations (UEFA) and the European Professional Club Rugby (EPCR), can be found in the region.
In der Greater Geneva Bern area sind weltweit am meisten internationale Sportorganisationen und –verbände angesiedelt, unter anderem das Internationale Olympische Komitee (IOK), der europäische Fussballverband (UEFA) und der European Professional Club Rugby (EPCR). 2006 wurde in Lausanne das House of International Sport (MSI) gegründet, das einzige Zentrum weltweit, das unter einem Dach mehrere Akteure der
  34 Treffer www.cim.org  
“But will it be able to accommodate all of the projects that are coming in the Trough? No.” Kami’s timing enables it to secure its share of the carrier’s remaining capacity. QNS&L has the ability to add 45 Mt to the current 35 Mt from IOC, Cliffs, and Labrador Iron Mines.
Cette chance n’est pas donnée à toutes les sociétés. « QNS&L a encore une certaine capacité disponible sur sa ligne de chemin de fer », explique Nochane Rousseau, chef de groupe de l’industrie minière pour le Québec chez PricewaterhouseCoopers Canada. « Mais sera-t-il en mesure de répondre à la demande de tous les projets à venir dans la fosse du Labrador ? Non. » Le calendrier avancé de Kami lui permet d’assurer sa part sur la capacité restante du transporteur. QNS&L a la possibilité d’ajouter 45 millions de tonnes (Mt) aux 35 présentement réservés à IOC, Cliffs et Labrador Iron Mines.
Arrow 1 2 3 4 5 6 7 8 9 10 Arrow